Garden-fresh finds · Free shipping over $65 · Browse the beds

87-16: Restoration, Testing and Repair of 30-Year Cooling Tower at the Corrosion Evaluation and successful results of

SKU: 94803949867

4.0
USD20.00 USD70.00

Pay in 4 interest-free payments of $5.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 16 - Aug 21

Description

Evaluation and successful results of the use of a weak organic acid and amine compound to increase hardness salt solubility at alkaline pH levels in an open recirculating cooling system

Actual operating conditions can produce pressure and flow conditions that create significant dynamic piping loads

Control of water treatment chemistry utilizing instrument measurement of system water flow and cycles of concentration provides precise control of chemical additives

modular and cost-effective test set-up to thermally assess an individual cell of the tower

A numerical model to predict the ice transport and accumulation at the river intake was developed and validated

87-16: Restoration, Testing and Repair of 30-Year Cooling Tower at the Corrosion Evaluation and successful results ofFour fan cells of a 30 year old, 14 cell crossflow, redwood splash fill tower were selected to install and test PVC V Bar fill. This paper deals with the demolition, installation and unique method of collecting tower off water temperature data to perform a CTI Performance Test. Because of cooling demand the entire 14 cell fan cell tower had to remain in service during the tests.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products